Method for controlling the forward movement speed of the screw in an injection molding machine
Abstract
In the filling step, the forward movement speed of the screw is controlled in accordance with a predetermined speed pattern until the screw reaches a deceleration initiation point, LS 4 B. After the screw reaches LS 4 B, a deceleration step is started. In the deceleration step, the forward movement speed of the screw is controlled in a feedback manner such that the internal pressure of the mold reaches a predetermined target pressure. When the screw reaches a pressure holding initiation point, LS 4 (or pressure holding initiation time, TR 2 ), the pressure holding step is started. In the pressure holding step, the target pressure, which is a function of time, is changed with time in accordance with a program. When the operation goes to the pressure holding step, the set of PID coefficients within the feedback control loop are replaced by different set of PID coefficients.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 8.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for controlling a forward movement speed of a screw in an injection molding machine in which a molten resin stored in a heating barrel is fed into a mold by advancing the screw within the heating barrel, comprising: controlling the forward movement speed of the screw in accordance with a predetermined speed pattern after the initiation of the forward movement until the screw reaches a predetermined deceleration initiation point; measuring an internal pressure of the mold and controlling the forward movement speed of the screw in a feedback manner such that the internal pressure reache
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗