Method for identifying a loss of utilization of mobile assets
Abstract
A method of servicing a mobile asset subject to utilization loss factors delaying the completion of servicing and the timely return of the asset to operation including identifying utilization loss factors that could delay the timely completion of servicing of the mobile asset. Identifying service procedures associated with each utilization loss factor and providing a database of events associated with the service procedures the events indicative of a status of completion of the procedures. A schedule may be established for at least one event for the timely completion of the respective service procedure. Monitoring the at least one event to determine when the event occurred relative to the scheduled time and if the at least one event is late, providing notice that the relevant utilization loss factor is likely to cause delay in the timely return of the asset to operation unless corrective action is taken. Operational parameters associated with the mobile asset may be remotely monitored while the asset is in-use to determine whether the mobile asset is in need of at least one of the repair, maintenance and/or other servicing procedures. If the mobile asset is in need of one of these
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 50.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of servicing a locomotive subject to utilization loss factors delaying the completion of servicing the locomotive and the timely return of the locomotive to operation, the method comprising: identifying at least one utilization loss factor that could delay the timely completion of servicing the locomotive; identifying a service procedure for the locomotive associated with at least one utilization loss factor; accessing a database storing information with respect to at least one event associated with the service procedure indicative of a status of completion of the procedure, wherein t
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 50 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (2)
- Data-Tronic Gas Turbine Information And Control System; General Electric Gas Turbine Reference Library; 8 pp.
- Trobec R. et al; "Optimization Of Diagnostic Examination"; Joint International Conference On Vector And Parallel PRocessing; Berlin De 1994, pp. 761-772, XP000974309.