Abstract

An anti-jacking pile solution particularly suited for use in permafrost or cold regions. The pile includes bond breaking material for preventing frozen soil from directly gripping a pile near the surface of the soil and pulling the pile upward. A collar is attached to the pile to prevent damage and/or displacement of the bond breaking material during driving of the pile. The pile may be attached to a building by way of an adjustable connection system allowing for future adjustments in the event of vertical movement.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 3.

Claims (3 — 2 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of installing an anti-jacking pile system, comprising the steps of; a) wrapping a section of outer surface of a pile with a bond breaking material, said section having an upper end and a lower end; b) attaching a collar at a location adjacent said bond breaking material at said lower end of said section and further attaching said collar directly to said outer surface of said pile for protecting said bond breaking material from being damaged by the surrounding soil during driving of said pile; c) driving said pile into soil a sufficient depth to act as a support for a structure.

  2. Claim 2Depends on #1

    The method as set forth in claim 1 , further including the step of; a) applying a coating of lubricant to said pile prior to wrapping said section with said bond breaking material.

  3. Claim 3Independent Claim

    The method as s

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (4)

  • Design Standards for Government Facilities, Government of Yukon, Feb. 9, 1999.
  • Foundation and stands, triple stage cribbing stand from www. Perfectaline.com.
  • Stark et al., Expedient MESL Construction in Cold Weather, Technical Report ERDC/CRREL U.S. Army Corps of Engineers, Jul. 2000.
  • www.reefindustries.com/permalon.html , Description of Permalon.