Industrial controller with clock-synchronous running level model
Abstract
A runtime system of an industrial controller has a running level model which has a plurality of running levels of different types with different priority. This stratification allows for minimization of the communication between the process controller and motion controller tasks. The running level model has a hierarchical structure with various running levels such as synchronously clocked levels, a user level for system exceptions, an event-controlled user level, a time-controlled user level, a sequential user level and a cyclical user level. Other prioritizing stratifications also may be provided.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 9.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An industrial controller for production machines having a runtime system, the runtime system having a running level model with a hierarchical structure, the running level model comprising: (a) a group of synchronously clocked levels derived from a basic clock, the group of levels including at least one system level and at least one user level, with each said level having a priority level assigned to it, said at least one user level being operable to run synchronously in relation to at least one of said system levels; (b) a user level for system exceptions, having a priority hierarchically loca
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (9 of 9 total)
References Cited — Backward Prior Art (6)
Non-Patent Literature (3)
- Fujita et al. An Active Scheduler: Autonomous Concurrency Control of Parallel Programs in a Distributed Environment. IEEE. 2001. pp. 415-422.
- Ish-Shalom et al. Signal Processor Architecture for High-Performance Real-Time Applications. IEEE. 1989. pp. 184-193.*
- Regehr. Scheduling Tasks with Mixed Preemption Relations for Robustness to Timing Faults. IEEE. 2002. pp. 315-326.*