System load testing coordination over a network
Abstract
A method and system using one or more load cells coordinates load testing of one or more sites under test over a network such as the Internet in accordance with one or more load test requests. In one embodiment, such method and system facilitates an economic, efficient, and accurate evaluation of the capacity of the SUTs to support concurrent users of the SUTs. A load test request is received from a User and provides information concerning a load test to be performed on a site under test (SUT). A load test is generated, and the load test is allocated to one or more load cells. The load cells perform the load test by sending load test data to the SUT and receiving responses from the SUT. Portions of a load test may be allocated to different load cells, which may be geographically remote from the SUT and/or geographically diverse. Multiple concurrent pending load tests may be processed for the same SUT. A load cell may concurrently perform all or a portion of multiple different load tests for multiple different SUT's simultaneously. A reporting function generates a report based on the responses received from the SUT. The reporting function may in addition or alternatively allow t
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 61.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of load testing at least one site under test (SUT) in accordance with at least one load test request which provides information for load testing at one SUT, the method compromising: reviewing at least one load test request; generating at least one load test corresponding to at least one load test request; allocating the load test to a at least one load cell; sending respective load test data in accordance with the load test from the at least one load cell to at least one SUT to collectively conduct the load test; and receiving responses with the at least one load cell to the load test
- Claim 2Depends on #1
The method as in claim 1 wherein allocating the load test to the at least one load cell compromises: determining an availability of a sufficient number of the at least one loa
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗