Method for casting a partially reinforced concrete pile in the ground
Abstract
A method for casting a partially-reinforced concrete pile in the ground includes installing an elongate hollow tubular casing in a hole in the ground with an elongate portion of the hole extending downwardly beneath the lower end of the casing. Hardenable fluid concrete is conducted into the hole and casing so as to substantially fill the respective hollow cross-sections thereof. The concrete is permitted to reach a hardened state while the casing remains within the ground, thereby forming a concrete pile partially reinforced by the casing against side-loading in an upper portion of the pile.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 40 · Forward citations: 19.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for casting a partially reinforced concrete pile in the ground, said method comprising: (a) installing an elongate tubular casing, having an internal hollow cross-sectional area, and a foot assembly located adjacent a lower end of said casing, in a hole in the ground; (b) thereafter, driving said foot assembly into the ground so as to separate said foot assembly from said casing and thereby form an extended portion of said hole between said lower end of said casing and said foot assembly; (c) during step (b), driving said foot assembly by means of a hollow mandrel extending internally
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗