Patents
US 6,728,801 B2#14448519 Most CitedExpiredUnited States (USPTO)Utility

Method and apparatus for period promotion avoidance for hubs

7Forward Citations (#14448519 Global)
0.3/yrCitation Velocity (#24816380 Global)
2.41Citation PageRank (#10806933 Global)
7Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A device is presented including a host controller capable of attaching a quantity of queue heads to a frame list. The quantity of queue heads are attached to the frame list before any transaction descriptors. Further presented is a method including determining whether a queue head has less than or equal to a predetermined packet size and whether a period is one of greater than and equal to a predetermined schedule window. The method includes storing contents of a current entry in a frame list in a next pointer in the queue head. Also replacing the current entry in the frame list with a pointer to a new queue head. Many queue heads are directly coupled to the frame list.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 7.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method comprising: determining whether a queue head has one of less than a predetermined packet size and equal to the predetermined packet size and whether a period is one of greater than and equal to a predetermined schedule window; storing contents of a current entry in a frame list in a next pointer in the queue head; and replacing the current entry in the frame list with a pointer to a new queue head, wherein a plurality of queue heads are directly coupled to the frame list before any split-isochronous transaction descriptors where split-isochronous transaction descriptors are supported.

  2. Claim 2Depends on #1

    The method of claim 1 , wherein the predetermined packet size is one byte.

  3. Claim 3Depends on #1

    The method of claim 1 , wherein the predetermined schedule window is determined during initialization of a host

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗