Expandable packer isolation system
Abstract
A completion technique to replace cementing casing, perforating, fracturing, and gravel packing with an open hole completion is disclosed. Each zone to be isolated by the completion assembly features a pair of isolators, which are preferably tubular with a sleeve of a sealing material such as an elastomer on the outer surface. The screen is preferably made of a weave in one or more layers with a protective outer, and optionally an inner, jacket with openings. The completion assembly can be lowered on rigid or coiled tubing which, internally to the completion assembly, includes the expansion assembly. The expansion assembly is preferably an inflatable design with features that provide limits to the delivered expansion force and/or diameter. A plurality of zones can be isolated in a single trip.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 28.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A well completion method for isolating at least one zone, comprising: running into the wellbore a string with at least one isolator in conjunction with a tool which allows flow from the surrounding formation into the string; expanding said isolator and said tool in said wellbore; running in an anchor with said string; setting the anchor before said expanding; and releasing the string from the anchor before said expanding.
- Claim 2Independent Claim
A well completion method for isolating at least one zone, comprising: running into the wellbore a string with at least one isolator in conjunction with a tool which allows flow from the surrounding formation into the string; expanding said isolator and said tool in said wellbore; running in an expansion assembly comprising an inflatable with said str
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗