Controllable gas-lift well and valve
Abstract
A gas-lift well having a controllable gas-lift valve is provided. The well uses the tubing and casing to communicate with and power the controllable valve from the surface. Induction chokes at the surface and downhole electrically isolate the tubing from the casing. A high band-width, adaptable communication system is used to communicate between the controllable valve and the surface. Additional sensors, such as pressure, temperature, and acoustic sensors, may be provided downhole to more accurately assess downhole conditions. The controllable valve is varied opened or closed, depending on downhole conditions, oil production, gas usage and availability, to optimize production and assist in unloading. While conventional, bellows-type, gas-lift valves frequently fail and leak—often undetected—the controllable valve hereof permits known precise operation and concomitant control of the gas-lift well.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 87.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A controllable gas-lift well, comprising: a wellbore extending from a first location to a second location; a production tubing positioned and longitudinally extending within the wellbore; an AC power supply electrically coupled to the production tubing near the first location and operable for supplying an AC signal along the production tubing towards the second location; a gas-lift valve coupled to the production tubing between the first location and the second location, the valve being adjustable to regulate the fluid flow between an interior and an exterior of the tubing, the valve being ele
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 87 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Brown. Connolizo and Robertson, West Texas Oil Lifting Short Course and H.W. Winkler, "Misunderstood of overlooked Gas-Lift Design and Equipment Considerations," SPE, p. 351 (1994).
- Der Spek, Alex, and Aliz Thomas, "Neural-Net Identification of Flow Regime with Band Spectra of Flow-Generated Sound", SPE Reservoir Eva. & Eng.2 (6) Dec. 1999, pp. 489-498.
- Otis Engineering, Aug. 1980, "Heavy Crude Lift System", Field Development Report, OEC 5228, Otis Corp., Dallas, Texas, 1980.
- Sakata et al., "Performance Analysis of Long Distance Transmitting of Magnetic Signal on Cylindrical Steel Rod", IEEE Translation Journal on magnetics in Japan, vol. 8, No. 2. Feb. 1993 , , pps. 102-106.
- Search Report dated Dec. 6, 2001.