Apparatus and method for cooling power transformers
Abstract
The load current drawn from a power transformer is sensed to determine if and when the load current exceeds a predetermined threshold. The length of time the load current exceeds the threshold is also sensed. By monitoring the excess current flow and the length of time for which it flows, it is possible to anticipate a rise in the winding temperature of the power transformer and to initiate cooling before the windings have reached a critical temperature, as a function of the ambient temperature and/or the temperature of the transformer. Thus, systems embodying the invention include circuitry for sensing the current drawn from and/or by a transformer, determining when the current exceeds a predetermined value and timing circuits for sensing the length of time for which the excess current flows. The timing circuits are needed, in part, to differentiate between a transitory overload condition and a static, continuous, overload condition.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 13.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
In an electrical power system including a power transformer which may be subjected to a load condition causing the temperature of the power transformer to rise above a desired level, the combination comprising: means for sensing the amplitude of one of the load current flowing into the power transformer and the load current flowing out of the power transformer and for constantly comparing the amplitude of said load current with a predetermined threshold level and producing a first over-threshold signal whenever the load current exceeds the threshold level; and means including a timing circuit
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗