Recloser and fuse coordination scheme
Abstract
An automatic power restoration device has a modifiable end point. The end point is indicative of the operational parameters of the automatic power restoration device. A user can modify the end point and thus the operational parameters of the automatic power restoration device. The end point can be modified according to the protection characteristics of other fault protection devices within a power system.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 29.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
An automatic power restoration system connected to a power system comprising: an automatic power restoration device; and a control device, the control device comprising: a microprocessor; a memory; and a software application supporting a programmable end point, the end point indicative of the operational characteristics of the automatic power restoration system and programmable to coordinate automatic power restoration device curve characteristics with fault protection device curve characteristics by modifying the end point of the automatic power restoration system.
- Claim 2Depends on #1
The automatic power restoration system of claim 1 , wherein the programmable end point is user-programmable or automatically programmable by the software application responsive to conditions in the power system.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 29 total)
References Cited — Backward Prior Art (18)
Non-Patent Literature (4)
- Toth L.S., et al. Enhanced Sectionalizing Through Proper Testing of Recloser Time Current Curves, 1994 Rural Electric Power Conference Papers Presented at the 38<th >Annual Conference, Paper No. 94 B5, IEEE Rural Electric Power Confernece, Colorado Springs, Co., Apr. 24-26, 1994, pp. B5/1-7.
- Toth L.S., et al. Enhanced Sectionalizing Through Proper Testing of Recloser Time Current Curves, 1994 Rural Electric Power Conference Papers Presented at the 38th Annual Conference, Paper No. 94 B5, IEEE Rural Electric Power Confernece, Colorado Springs, Co., Apr. 24-26, 1994, pp. B5/1-7.
- VR-3S Recloser 15-38kV brochure, ABB Distribution Automation Equipment Division, Raleigh, NC, Descriptive Bulletin 38-741-27 (Jun. 1999).
- Witte, J.F., et al., "Computer-Aided Recloser Applications For Distribution Systems," IEEE Computer Applications in Power, IEEE Inc., New York, USA, vol. 5, No. 3, Jul. 1, 1992, pp. 27-32.