Method of monitoring manufacturing apparatus
Abstract
When the operation of any of manufacturing apparatus is halted, influence exerted by the operation halt on the manufacturing state of each of products is evaluated based on the difference between the number of products in a processing waiting state in the manufacturing apparatus at a time at which the operation of the manufacturing apparatus is halted or at a time antecedent thereto and the number of products in the processing waiting state in the manufacturing apparatus at a time at which the manufacturing apparatus is reoperated after the operation thereof is halted or at a time posterior thereto or on the difference between the period during which the product processed by the manufacturing apparatus during a given period antecedent to the time at which the operation of the manufacturing apparatus is halted is in the processing waiting state in the manufacturing apparatus and the period during which the product processed by the manufacturing apparatus during the given period posterior to the time at which the manufacturing apparatus is reoperated after the operation thereof is halted is in the processing waiting state in the manufacturing apparatus.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for evaluating a manufacturing line that sequentially processes a product using a plurality of manufacturing apparatuses to manufacture the product, the method evaluating an influence, which is caused by a halting of any of the manufacturing apparatuses, on the manufacturing line as a halt influence, the method comprising the step of: evaluating the halt influence based on a difference between a first number of processing waiting products and a second number of processing waiting products, the first number of processing waiting products being a number of products in a processing waiti
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 7,487,003 B1 | Automatic tracking of a lot of items through virtual sublots | 2009 | 3 |