Patents
US 6,655,455 B2#1548286 Most CitedExpiredUnited States (USPTO)Utility

Flow completion system

38Forward Citations (#1548286 Global)
1.6/yrCitation Velocity (#2981723 Global)
4.01Citation PageRank (#4751692 Global)
8Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising a tubing spool, a tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surrounding the tubing string; a first closure member which is positioned in the production bore above the production passageway; a first annular seal wherein the first closure member and the first seal comprise a first pressure-containing barrier between the well bore and a surrounding environment; a second closure member which is positioned in the production bore above the first closure member; and a second annular seal wherein the second closure member and the second seal comprise a second pressure-containing barrier between the well bore and the environment; and wherein both the first and the second barriers are associated with the tubing hanger.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 38.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A flow completion system for controlling the flow of fluid from a well bore, the flow completion system comprising: a tubing spool which includes a central bore that extends axially therethrough and a production outlet which communicates with the central bore; a tubing hanger which is supported in the central bore and which includes a production bore that extends axially therethrough and a production passageway that communicates between the production bare and the production outlet, the tubing hanger supporting a tubing string which extends into the well bore and defines a tubing annulus surro

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (2)

  • Amoco Production Company Conceptual Design Study-Subsea Well Completions with Electrical Submersible Pumps (FMC Petroleum Equipment Group, Jan. 12, 1990).
  • Amoco Production Company Conceptual Design Study—Subsea Well Completions with Electrical Submersible Pumps (FMC Petroleum Equipment Group, Jan. 12, 1990).