Patents
US 6,651,741 B2#5374836 Most CitedExpiredUnited States (USPTO)Utility

Method of increasing productivity of oil, gas and hydrogeological wells

17Forward Citations (#5374836 Global)
0.7/yrCitation Velocity (#10338678 Global)
2.68Citation PageRank (#9075953 Global)
6Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A method of increasing the productivity of oil, gas and hydrogeological wells has the steps of performing a slot unloading, providing a cyclical treatment of a near well zone with a formation-treating substance, with a use of cutting slots, determining a region to be treated, selecting a corresponding volume of a treating technological composition, and introducing the volume into a formation to be treated, and subdividing the method into a two stages including a first stage performed by a partial slot unloading of a near well zone so as to remove a main part of support stresses, and a second stage of removing a remaining part of support stresses by a cyclical treatment of the well with a formation-treating substance with control by the density of the rock to be treated and performing a corresponding correction.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 17.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method of increasing the productivity of oil, gas and hydrogeological wells, comprising the steps of cutting slots only in a near well zone so as to perform a partial unloading of the well and to remove a part of support stresses; and cyclically treating the well with a formation-treating substance so as to remove a remaining part of the support stresses, with controlling a density of a formation and correcting the cyclical treatment in correspondence with the density of the formation.

  2. Claim 2Depends on #1

    A method as defined in claim 1 , wherein said slot cutting includes cutting of slots only in a surrounding column, a cement layer, and a part of rock which immediately adjoins the well.

  3. Claim 3Depends on #2

    A method as defined in claim 2 , wherein said slo

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗