Method of handling a large structure in a reactor building
Abstract
When carrying the large structure out through an aperture portion provided at a roof of a reactor building, a chamber for covering the aperture is provided at the roof so that work of providing the chamber for covering the aperture portion can be performed independent of other work performed in the reactor building, before at least a part of work of using a roof crane and at least a part work of handling fuel assemblies in the reactor building.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 4.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of handling a large structure in a reactor building for carrying said large structure out through an aperture portion provided at a roof of said reactor building, wherein an isolation chamber is provided to said roof of said reactor building at a position between said roof of said reactor building and traveling path of an overhead traveling crane in said reactor building, an aperture portion is formed at a location directly above said isolation chamber of said roof of said reactor building, and said large structure in said reactor building is carried out through doors of said isolatio
- Claim 2Depends on #1
A method of handling a large structure as claimed in claim 1 , wherein said isolation chamber is provided with said doors.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗