Patents
US 6,587,737 B2#5199088 Most CitedExpiredUnited States (USPTO)Utility

Method for the monitoring of a plant

17Forward Citations (#5199088 Global)
0.7/yrCitation Velocity (#10319507 Global)
3.94Citation PageRank (#4875722 Global)
7Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method is proposed for the monitoring of a plant having a plurality of sub-systems which is operable at variable working points. Respective measured values are detected for a fixed set of process parameters (B, U, S 1 , . . . , SN) at pre-settable time intervals during the operation of the plant ( 1 ). The measured values detected in a learning phase for different working points are used to prepare models (M 1 , M 2 , . . . , MN) for the operating characteristics of the sub-systems ( 11, 12, . . . , 1 N). At least one monitoring parameter (Ri, Ri k ), which is independent of the respective current working point, is determined at pre-settable time intervals in an operating phase using the models (M 1 , M 2 , . . . , MN) and the time-dependent course of the monitoring parameter (Ri, Ri k ) is used for the monitoring of the plant ( 1 ). A pre-check ( 2 ) is carried out prior to the determination of the monitoring parameter (Ri, Ri k ), in which a check is made whether at least the measured values for those process parameters which are operating parameters (B) are within a pre-determined range.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 17.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for the monitoring of a plant having a plurality of sub-systems which is operable at variable working points and comprising the following steps: a) respective measured values are detected for a fixed set of process parameters (B, U, S 1 , . . . , SN) at pre-settable time intervals during the operation of the plant ( 1 ); b) the measured values detected in a learning phase for different working points are used to prepare models (M 1 , M 2 , . . . , MN) for the operating characteristics of the sub-systems ( 11 , 12 , . . . , 1 N), with the input values of each model (M 1 , M 2 , . . .

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗