Multi-stage processes for coating substrates with liquid basecoat and powder topcoat
Abstract
Processes for coating metal or polymeric substrates are provided which include the steps of: (a) applying a liquid basecoating composition to a surface of the metal substrate; (b) applying a first infrared radiation at a power density of 30 kilowatts per meter squared or less and a first air simultaneously to the basecoating composition for a first period of at least about 30 seconds, a first velocity of the air at the surface of the basecoating composition being about 4 meters per second or less, a first temperature of the metal substrate being increased at a first rate ranging from about 0.05° C. per second to about 0.3° C. per second to achieve a first peak metal temperature ranging from about 30° C. to about 60° C., such that a pre-dried basecoat is formed upon the surface of the metal substrate; (c) applying a second infrared radiation and a second air simultaneously to the basecoating composition for a second period of at least about 15 seconds, a second velocity of the air at the surface of the basecoating composition being about 4 meters per second or less, a second temperature of the metal substrate being increased at a second rate ranging from about 0.4° C. per second to
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A process for coating a metal substrate, comprising the steps of: (a) applying a liquid basecoating composition to a surface of the metal substrate; (b) applying a first infrared radiation at a power density of 30 kilowatts per meter squared or less and a first air simultaneously to the basecoating composition for a first period of about 30 seconds or more, a first velocity of the air at the surface of the basecoating composition being about 4 meters per second or less, a first temperature of the metal substrate being increased at a first rate ranging from about 0.05° C. per second to about 0.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (7 of 7 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- "Combination Ovens for Curing of Powder Coatings", IUT no date.
- "Gas Infrared Ovens", Thermovation Engineering Inc. http://www.thomasregister.com/olc/thermovation/gas.htm (Mar. 12, 1999).
- "Heated Flash Technical Specifications", General Motors NAO Paint General Technical Specifications Document No. 34909 (Jan. 14, 1997).
- "Infrared Flash Oven" Brochure, BGK Automotive Group 1989, no month.
- "Powder Coatings", Blasdel Equipment Infrared Ovens http://blasdelent,com/powder.html (Mar. 12, 1999).