Method for injection molding
Abstract
The retreat completion position of the screw in the charging step in actual production is controlled based on the result in pilot production as follows. In pilot production, the measurement value Ts of the screw driving torque is integrated with respect to the screw position P from the forward limit to the retreat completion position Ps. When conforming item is produced in the pilot production, the value ΣTs·dP obtained as a result of the integration is stored as a reference value. After actual production begins, the measurement value Tx of the screw driving torque is integrated in real time with respect to the screw position P from the forward limit to the screw position at each time. The obtained value ΣTx·dP is monitored. When this value ΣTx·dP coincides with the reference value ΣTs·dP, it is determined that the charging step has been completed, and the retreat operation of the screw is stopped.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 7.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for injection molding for introducing and melting molding material in a barrel containing a screw, and thereafter injecting a molten material into a mold, said method comprising the steps of: carrying out pilot production to collect data showing a relationship between a screw retreat distance from a forward limit and screw driving torque when introducing and melting the molding material in the barrel, and integrating the screw driving torque with respect to the screw retreat distance from the forward limit to a retreat completion position of the screw, thereby obtaining a first integr
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗