Load moment indicator of crane
Abstract
An load moment indicator, in a crane provided with hoist means of a main side and an auxiliary side, including a calculator in which a reference value if a rated load determined by the stability of a crane or the like is preset, a hoist load of the other side is converted into a load component of its own side, and the converted value is subtracted from a reference value of its own side to thereby obtain a rated load of own side, or in which a tolerant load that can be suspended by the other side is converted into a load component of its own side on the basis of a base of a reference value of the other side, and the converted value is compared with the reference value of its own side to select a lower value. Thereby, it is possible to make the most of the suspending ability of the main side and the auxiliary side and for an operator to grasp clearly a tolerance of the hoist load.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 22.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An load moment indicator of a crane comprising: a boom having a hoist arm provided at an extreme end; a first hoist means for carrying out a first hoisting work, said first hoist means having a first winch, a first rope drawn out of said first winch and suspended from the extreme end of said boom, and a first hook suspended by said first rope; a second hoist means for carrying out a second hoisting work, said second hoist means having a second winch, a second rope drawn out of said second winch and suspended from said hoist arm, and a second hook suspended by said second rope; and a calculator
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗