Process of manufacturing a core metal insert
Abstract
A core metal insert for use in a sealing assembly is disclosed. The core metal insert is manufactured by a process which includes the step of cutting a plurality of left lateral outermost inboard slits and a plurality of right lateral outermost inboard slits in a metal blank so as to create a slitted metal blank. The process of manufacturing the core metal insert further includes the step of coining the slitted metal blank so that the core metal insert is manufactured with (i) a plurality of left lateral outermost inboard gaps defined therein, (ii) a plurality of right lateral outermost inboard gaps defined therein, (iii) a left lateral coin-formed bridge which is positioned within each left lateral outermost inboard gap of the plurality of left lateral outermost inboard gaps and which divides each left lateral outermost inboard gap into a first left lateral outermost inboard subgap and a second left lateral outermost inboard subgap, each of the first left lateral outermost inboard subgap and the second left lateral outermost inboard subgap extends through the core metal insert, and (iv) a right lateral coin-formed bridge which is positioned within each right lateral outermost inbo
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 11.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A process of manufacturing a core metal insert, including the steps of: forming in a metal blank at least one inboard slit which extends continuously from a left lateral slit end to a right lateral slit end; and expanding said metal blank to create an inboard gap therein, said expanding step including the step of displacing a quantity of metal of said metal blank so as to create a bridge with said quantity of metal which (i) is positioned within said inboard gap, and (ii) divides said inboard gap into a first inboard subgap and a second inboard subgap, wherein said bridge is spaced apart from
- Claim 2Depends on #1
The process of claim 1 , wherein each of said first inboard subgap and said second inboard subgap extends through said core metal insert.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (11 of 11 total)
References Cited — Backward Prior Art (17)
Non-Patent Literature (2)
- Blueprint entitled, "Continuous Metal Insert: Diamond Ladder", dated Sep. 16, 1996.
- Marketing brochure entitled, "CMI Continuous Metal Insert", printed by The Gem City Engineering Company, P.O. Box 1295, Dayton, Ohio 45401.