Electrical system with a stress shield system for partial discharge on-line monitoring of the state of high-voltage insulation
Abstract
An electrical system and a sensor for on-line monitoring of the state of high-voltage insulation in the electrical system. In this arrangement, the signals associated with partial discharge activity are monitored and transmitted from the sensor to monitoring instrumentation. The sensor is interconnected with the potential stress shield of existing bushings. The capacitance in the bushing between the main conductor and the stress shield conducts partial discharge current which is available for being sensed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 26.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A partial discharge sensor system for on-line monitoring of an electrical system comprising: a conductor at a given voltage potential; electrical insulation disposed proximate said conductor; a voltage stress shield disposed proximate said insulation, there being no electrically conductive material between said conductor and said stress shield, said conductor and said electrical insulation cooperating as a capacitance which conducts partial discharge electrical current therethrough; and a sensor current device, said sensor current device being connected electrically to said voltage stress shie
- Claim 2Depends on #1
The partial discharge system of claim 1 , wherein said sensor current device comprises a current transformer hav
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 26 total)
References Cited — Backward Prior Art (18)
Non-Patent Literature (5)
- Braunlich et al., Assessment of Insulation Condition of Large Power Transformers by On-Site Electrical Diagnostic Methods, IEEE International Symposium on Electrical Insulation, Anaheim, CA USA, Apr. 2-5, 2000.*
- Experience in the Application of the On-Line Monitoring System Using Power Frequency and Partial Discharges to High Voltage Transformer and Bushing Insulation-Z. Berler, L. Letitskaya. V.S. Rashkes, P. Svy EPRI Substation Equipment Diagnostics Conference VI, Feb. 16-18, 1998, New Orleans, LA.
- Experience in the Application of the On-Line Monitoring System Using Power Frequency and Partial Discharges to High Voltage Transformer and Bushing Insulation—Z. Berler, L. Letitskaya. V.S. Rashkes, P. Svy EPRI Substation Equipment Diagnostics Conference VI, Feb. 16-18, 1998, New Orleans, LA.
- Methods and Devices for Diagnostics of High-Voltage Equipment, P. Svy 1992, (Month Was Not Available).
- On-Line Monitoring of Power Transformers-Trends, New Developments and First Experiences-T. Liebfried, W. Knorr, K. Viereck-CIGRE, 1998, #12-211, Month Was Not Available.