Offshore floating production method
Abstract
A method of conducting operations to an offshore field from multiple separated drill centers using a floating vessel having a turret-mounted mooring element and a workstation separate from the mooring element in which the vessel is moored at a central mooring element location and operations are sequentially carried out at separate drill centers associated with the mooring element location by allowing the vessel to weathervane to a heading associated with a subsequent drill center once operations have been completed at a first drill center.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 24.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of conducting operations to an offshore field from multiple separated drill centers, the method using a floating vessel having a turret-mounted mooring element and further having a workstation horizontally spaced apart from the mooring element, comprising the steps of: a) locating the mooring element approximately over a first mooring element location; (b) limiting the horizontal movement of the mooring element using a plurality of mooring lines extending from the mooring element; (c) allowing the vessel to weathervane such that the workstation is substantially vertically aligned over
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗