Steam cooling system for a gas turbine
Abstract
The steam cooling circuit for a gas turbine includes a bore tube assembly supplying steam to circumferentially spaced radial tubes coupled to supply elbows for transitioning the radial steam flow in an axial direction along steam supply tubes adjacent the rim of the rotor. The supply tubes supply steam to circumferentially spaced manifold segments located on the aft side of the 1 - 2 spacer for supplying steam to the buckets of the first and second stages. Spent return steam from these buckets flows to a plurality of circumferentially spaced return manifold segments disposed on the forward face of the 1 - 2 spacer. Crossover tubes couple the steam supply from the steam supply manifold segments through the 1 - 2 spacer to the buckets of the first stage. Crossover tubes through the 1 - 2 spacer also return steam from the buckets of the second stage to the return manifold segments. Axially extending return tubes convey spent cooling steam from the return manifold segments to radial tubes via return elbows.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 24.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
In a turbine rotor having axially spaced wheels mounting buckets, and spacers between said wheels, a cooling system for cooling the buckets, comprising: a plurality of cooling medium supply passages circumferentially spaced from one another about and adjacent a rim of the rotor; a plurality of spent cooling medium return passages circumferentially spaced from one another about and adjacent the rim of the rotor; a plurality of supply manifold segments circumferentially spaced from one another about and adjacent the rim of said rotor, each said supply manifold lying in communication with at leas
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 24 total)
References Cited — Backward Prior Art (6)
Non-Patent Literature (5)
- "39th GE Turbine State-of-the-Art Technology Seminar", Tab 1, ""F" Technology-the First Half-Million Operating Hours", H.E. Miller, Aug. 1996.
- "39th GE Turbine State-of-the-Art Technology Seminar", Tab 10, "Gas Fuel Clean-Up System Design Considerations for GE Heavy-Duty Gas Turbines", C. Wilkes, Aug. 1996.
- "39th GE Turbine State-of-the-Art Technology Seminar", Tab 11, "Integrated Control Systems for Advanced Combined Cycles", Chu et al., Aug. 1996.
- "39th GE Turbine State-of-the-Art Technology Seminar", Tab 12, "Power Systems for the 21st Century "H" Gas Turbine Combined Cycles", Paul et al., Aug. 1996.
- "39th GE Turbine State-of-the-Art Technology Seminar", Tab 13, "Clean Coal and Heavy Oil Technologies for Gas Turbines", D. M. Todd, Aug. 1996.