Apparatus and method for testing fuses
Abstract
A voltage is applied across a control resistor, and the voltage is caused to decay. The decay is monitored by a testing circuit such as a comparator. When the voltage across the control resistor has decayed to a value less than or equal to a reference voltage in the comparator, a switch time period is established. Fuses in a memory device are tested against the established switch time period. The fuses are tested in a similar fashion: a voltage is applied across the fuse being tested, and the voltage is caused to decay. The comparator monitors the decay of the voltage across the fuse. If the resistance value of a fuse being tested is within specification, the comparator changes its state at a time equal to or less than the switch time period established for the control resistor. Testing time for fuses can further be minimized by having an external access to the reference in the comparator. In establishing the switch time period by applying a voltage across the control resistor, the voltage of the reference in the comparator is adjusted to establish quicker switch time periods against which fuses are tested. In this manner, testing time is minimized.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 9.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A circuit for testing fuses in an integrated circuit comprising: a control resistor electrically interposed between a first supply node and a second supply node; and a testing circuit having an input and an access to a reference in the testing circuit, wherein the input of the testing circuit is in electrical communication with the first supply node.
- Claim 2Depends on #1
The circuit for testing fuses of claim 1 , wherein the first supply node is connected to a precharge voltage, and wherein the second supply node is connected to a potential lower than the first supply node.
- Claim 3Depends on #2
The circuit for testing fuses of claim 2 , wherein the second supply node is connected to ground.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗