Gas turbine and steam turbine installation
Abstract
A gas turbine and steam turbine installation has a waste-heat steam generator whose heating surfaces are connected into the water/steam cycle of the steam turbine. A gasification device is connected upstream of the gas turbine in order to provide an integrated gasification of a fossil fuel. Reliable operation of a saturator which is connected into a fuel line is ensured independently of the operating condition of the gasification device. For this purpose, a saturator-water heat exchanger connected with its secondary side into the saturator cycle is supplied, on its primary side, with feed water extracted from the water/steam cycle of the steam turbine. Thus it is possible to heat the feed water cooled in the saturator-water heat exchanger through the use of a partial flow of compressed air, and it is possible to supply the partial flow of compressed air to an air separation unit connected upstream of the gasification device.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 12.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A turbine installation, comprising: a gas turbine having a combustion chamber and a flue gas side; a steam turbine having a water/steam cycle; a waste-heat steam generator connected downstream of said flue gas side of said gas turbine, said waste-heat steam generator having heating surfaces connected into said water/steam cycle of said steam turbine; a fuel line; a gasification device for providing gasified fuel, said gasification device being connected upstream of said combustion chamber of said gas turbine via said fuel line; a saturator cycle for guiding a waterflow; a saturator connected i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗