Method for building an underground continuous wall
Abstract
An underground continuous wall building method and apparatus in which a chain cutter 2 provided with excavation blades is obliquely mounted on a running carriage 1. Slanting continuous trenches G1, G2 are excavated by moving the running carriage 1 in a transverse direction while rotating the cutter 2 with the cutter 2 obliquely placed in the ground, and a water cutoff material is poured into the excavated continuous trenches G1, G2 and solidified therein to build slanting continuous walls R1, R2 in the ground.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 26 · Forward citations: 26.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for building an underground continuous wall, comprising the steps of: placing a chain cutter carried by a running carriage obliquely in ground by sliding the chain cutter in an oblique direction by a hydraulic cylinder; moving the running carriage along a specified course over the ground, said running carriage carrying the chain cutter fixedly held in the oblique direction in the ground, said chain cutter being driven to form a first continuous slanting trench and a second continuous oppositely slanting trench; excavating the first and the second continuous slanting trenches so as
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗