Fluid conduit systems and methods for making
Abstract
Multilayer fluid conduits are formed by adhering to a tubular outer surface of a metal pipe, a thermoplastic outer layer. The outer layer permits ends of the multilayer conduit to be joined together in leak-proof fluid conduit systems simply by adhering the conduit ends with compatible thermoplastic fittings. For fire protection systems, the preferred metal is steel, the preferred thermoplastic is CPVC and the preferred adhesive is heat activated. The adhesive coated metal pipe is preheated and the CPVC is extruded onto the outer surface of the heated metal pipe. Through the use of fire resistive CPVC, the multilayer conduit systems of the present invention can be installed in more severe fire threat areas than can existing, all plastic piping, including all CPVC piping systems. The conduit is assembled into systems on site simply by cutting and direct bonding with ordinary, all plastic fittings using appropriate bonding agents such as solvent based adhesives. CPVC fittings are preferred for fire protection systems.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 40.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for making a system of metal/plastic composite conduits comprising the steps of: providing (1) a conduit formed by a hollow length of metal pipe having a pair of opposing open ends defined by a completely closed tubular outer surface, the open ends of the metal pipe defining open ends of the conduit, a layer of thermoplastic material completely covering the tubular outer surface of the metal pipe, and an adhesive layer between the metal pipe and the thermoplastic layer distributed so as to define a leak proof seal extending around the metal pipe between the metal pipe and the thermopl
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 40 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- ASTM Designation: A 795 93, Standard Specification for Black and Hot Dipped Zinc Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use, ASTM, Philadelphia, PA, 1993, 6 pages.
- ASTM Designation: A 795-93, "Standard Specification for Black and Hot-Dipped Zinc-Coated (Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use," ASTM, Philadelphia, PA, 1993, 6 pages.
- ASTM Destination: A 135 93, Standard Specification for Electric Resistants Welded Steel Pipe, ASTM, Philadelphia, PA, 1993, 7 pages.
- ASTM Destination: A 135-93, "Standard Specification for Electric-Resistants-Welded Steel Pipe," ASTM, Philadelphia, PA, 1993, 7 pages.
- Catalog data sheet entitled "Dyna-Light™ Schedule-5 Sprinkler Pipe", American2225e™ Company Incorporated, Phoenix AZ, (undated), 2 pp.