Method for drilling a well in unconsolidated and/or abnormally pressured formations
Abstract
A fiber reinforced cement lining for an unconsolidated or otherwise problematic zone in a wellbore is built up by first under-reaming the section of the wellbore to be stabilized by the cement lining. Next a drillable metallic liner is centralized in the under-reamed section and the annulus formed between the metal liner and the wellbore wall is filled with the fiber cement. After the cement has hardened, the drillable liner and a portion of its surrounding cement are milled out using the drillable liner as a guide for a piloted mill tool, thus leaving a relatively uniform thick-walled cement sheath bridging the zone to be stabilized in the wellbore while restoring the original diameter of the wellbore through the unconsolidated zone.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 42.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of stabilizing an unconsolidated formation traversed by a wellbore to permit forward drilling below said unconsolidated formation, said method comprising: a) under-reaming a section of said wellbore, wherein said under-reamed section includes all of said unconsolidated formation and extends slightly into formations both above and below said unconsolidated formation; b) installing in said wellbore a drillable metal liner assembly positioned to traverse said under-reamed section and to extend further into formations both above and below said unconsolidated formation; c) wherein said
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 42 total)
References Cited — Backward Prior Art (12)
Non-Patent Literature (2)
- J.P.M. van Vliet et al "Development and Field Use of Fibre-Containing Cement." Offshore Technology Conference, 27th Annual Conference, Houston TX 1995 discloses a soft centered cement plug as a guide for a pilot mill for drilling out part of a fibre cement layer to leave a relatively thin cement lin
- J.P.M. van Vliet et al Development and Field Use of Fibre Containing Cement. Offshore Technology Conference, 27th Annual Conference, Houston TX 1995 discloses a soft centered cement plug as a guide for a pilot mill for drilling out part of a fibre cement layer to leave a relatively thin cement linin