Method for manufacturing a tubular foundation in the ground
Abstract
A tool for making holes in the ground comprises a ram tip and coupling for connecting to a drive device, such as a hydraulically or pneumatically actuated pile driving machine, or a vibrating pile driving machine. A method for making tubular foundations in the ground comprises coupling a ram tip to a drive device, selecting a location for making a hole, placing the ram tip thereat, setting the drive device into operation to drive the ram tip into the ground to form a hole, removing the ram tip out of the hole, partially filling the hole with concrete, re-inserting the ram tip into the hole before the concrete sets, setting the drive device into operation and then removing the ram tip, thereby obtaining a tubular foundation.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 31 · Forward citations: 40.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
Method for manufacturing a tubular foundation in the ground comprising the steps of: (1) providing a tool for making holes in the ground, said tool comprising a ram tip having a free end and coupling means for connecting the ram tip to a drive device; (2) providing a drive device for successively exciting the ram tip downwardly in the direction of the free end with at least one of vibration and percussion; (3) coupling the drive device immediately behind the ram tip; (4) selecting a location for making a hole in the ground; (5) placing the tool thereat; (6) setting the drive device i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 40 total)
References Cited — Backward Prior Art (31)
Non-Patent Literature (2)
- 59 210124 (A) from Patent Abstracts of Japan, vol. 9, No. 80 .
- 59-210124 (A) from Patent Abstracts of Japan, vol. 9, No. 80 .