Process for installating a tight crossing in the wall of a cell
Abstract
A tight crossing to ensure a high efficiency seal between the interior (1) and the exterior (2) of a high activity cell. The crossing comprises a sleeve (6) placed in the wall (3), a guide tube (11) placed within the sleeve (6) and a support flange (12) placed between the sleeve (6) and the guide tube (11) on its outer end. A joint holder flange or ring (15) is placed in the cell interior (1) and is secured against the cell skin (4), the guide tube (11) and the sleeve (6) by means of captive bolts (18).
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 8.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
Process for installing a tight crossing in the wall (3) of a tight cell, the latter comprising a thick wall (3), a metal skin (4) placed in the interior (1) of the cell against the wall (3), a passage through the wall (3) and the skin (4) and a sealing bell (5) placed against the skin within the interior (1) of the cell, around the passage, the process comprising the following successive stages: a) placing a sleeve (6) in the passage, b) regulating the perpendicularity between the outside of the wall (3) and the sleeve (6), c) fitting a base plate (9) against the outer wall (8) of the cell
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗