Method for providing a sheet pile wall in the ground and a prefabricated wall element for carrying out such method
Abstract
A sheet pile wall is formed in the ground by excavating a first well and then excavating a second well spaced at a distance from the first well. The ground panel between the wells is then excavated to form a trench by using an excavating apparatus which is fitted with tubular guiding elements which are guided by the walls of the first and second wells. A prefabricated wall element having an arched center part is placed in the trench. The prefabricated wall element has edges which have meandering side faces. The edges of the wall element are brought into sealing contact with the walls of the trench, after which the first well is filled with concrete with the side face of the edge of the wall element serving as a shuttering to form a supporting nose engaging the side face.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for providing a sheet pile wall in the ground, said method comprising: excavating a first well by means of a drill head; subsequently excavating in a similar manner a second well, shifted relative to the first well over a distance resulting in a ground panel between the first well and the second well; excavating the ground panel located between the first well and the second well by means of an excavator which is fitted with tubular guiding elements, guided by the walls of the first well and the second well during excavation, thereby forming a trench; subsequently placing a press
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (1)
- Netherlands Search Report 9300245.