Method for fracturing a formation to control sand production
Abstract
A method for determining the minimum length for a fracture in a fluid-producing formation to control the production of sand therefrom wherein a plurality of critical drawdown pressures are calculated from known formation data which correspond to a plurality of different, estimated respective fracture lengths. Once the critical drawdown pressures for the reservoir are correlated with their corresponding fracture lengths, a critical drawdown curve for that particular reservoir is established. Additional sets of curves are generated from known data which when overlaid with the critical drawdown pressure curve allows a minimum length of fracture to be selected which will produce the formation at a given rate at a prescribed drawdown pressure without producing any substantial amounts of sand from the formation.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 22.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for determining the minimum length for a fracture in a fluid-producing formation to control the production of sand therefrom; said method comprising: measuring the strength of said formation and the fluid properties of the formation fluids; calculating a plurality of critical drawdown pressures, based on said measured strength and fluid properties which occur at a plurality of different fracture lengths, respectively, in said formation; selecting a desired, constant flowrate for producing said fluids from said formation; calculating the respective production drawdown pressures n
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗