Robot actuator position control method
Abstract
A workpiece is picked up by a robot actuator and transferred to an intermediate position relative to an objectpiece. The robot actuator then transfers the workpiece from the intermediate position to a predetermined location on the objectpiece. The movement of the robot actuator to the intermediate position is made on the basis of coordinate data of the intermediate position stored in a control system which controls the movement of the robot actuator. During transfer of the workpiece from the intermediate position toward the predetermined location, a determination is made as to whether the movement of the workpiece occurs for a predetermined time period. If the determination is negative, then it is concluded that the workpiece has not reached the predetermined location and the operation is shut down. If the determination is positive, then it is concluded that the workpiece has reached the predetermined location, and the coordinates of the workpiece at that predetermined location are used to define the intermediate position for the transfer of the next workpiece. That is done by resetting the coordinates for the intermediate position in the control system in accordance with the coord
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 10.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of controlling the movement of a robot actuator during the positioning of workpieces onto respective objectpieces at an objectpiece target zone, whereby each objectpiece receives a single one of said workpieces at said objectpiece target zone, comprising the steps of: A) transferring a first workpiece to an intermediate position relative to said objectpiece target zone, on the basis of coordinate data of said intermediate position stored in a control system for said robot actuator; B) moving a first objectpiece to said objectpiece target zone; C) moving said first workpiece from s
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗