Patents
US 5,454,436 A#1816977 Most CitedExpiredUnited States (USPTO)Utility

Method of warning of pipe sticking during drilling operations

34Forward Citations (#1816977 Global)
1.1/yrCitation Velocity (#5767583 Global)
8.21Citation PageRank (#1472464 Global)
9Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method of warning of the onset of pipe sticking in a rotary drilling operation using a drill string comprising: (a) monitoring the pressure of a drilling fluid being pumped through the drill string during drilling over predetermined periods of time to obtain series of pressure measurements; (b) monitoring the torque required to rotate the drill string during said periods to obtain series of torque measurements; (c) obtaining the skew (third moment) of each series of pressure measurements according to the relationship ##EQU1## wherein N is the number of pressure measurements xi in the series, xmean is the average value of the measurements in the series, and σ is the standard deviation of the measurements in the series; (d) obtaining the normalized standard deviation σn of the torque measurements in each corresponding series of torque measurements according to the relationship σn=(σ/ymean) wherein σ is the standard deviation of the measurements in the series and ymean is the average value of the measurements in the series; and (e) comparing skew and σn for the series so as to identify corresponding changes in both and raising an alarm when the magnitude of said changes pass predete

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 34.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of warning of the onset of pipe sticking in a rotary drilling operation using a drill string comprising: (a) monitoring the pressure of a drilling fluid being pumped through the drill string during drilling-over predetermined periods of time to obtain a series of pressure measurements; (b) monitoring the torque required to rotate the drill string during said periods to obtain a series of torque measurements; (c) obtaining the skew (third moment) of each series of pressure measurements according to the relationship ##EQU4## wherein N is the number of pressure measurements xi in the

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗