Patents
US 5,423,637 A#31803028 Most CitedExpiredUnited States (USPTO)Utility

Liner joining system and method

3Forward Citations (#31803028 Global)
0.1/yrCitation Velocity (#45469023 Global)
1.13Citation PageRank (#35059803 Global)
9Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A cutoff wall liner joining method includes the steps of: (1) excavating a slurry trench; (2) positioning a first layer of liner material within the excavated trench; (3) positioning two pipes adjacent to the liner material in such a manner as to form a substantially S-shaped configuration of the liner material around the pipes; (4) back filling a portion of the trench adjacent a first one of the pipes; (5) removing the other, second one of the pipes; (6) excavating an additional portion of trench extending away from the back filled portion; (7) positioning a second layer of liner material within the newly excavated portion to form a overlapping portion of liner material; (8) positioning a pipe adjacent to the remaining pipe in the trench such that it overlays the overlapping portion of liner material, then positioning a third pipe in the excavated additional trench portion; (9) back filling a portion of the trench adjacent the third pipe; (10) removing the third pipe; (11) back filling the space left by the third pipe; and then (12 ) removing the two remaining pipes, back filling the space left by each pipe as it is removed.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 3.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of joining liners within a trench, comprising the steps of: excavating a trench of predetermined width having a first wall and a second wall from a beginning point; inserting a liner having a first end and a second end in the trench; securing the first end of the liner against the first and second walls and extending the liner across the trench proximate the beginning point such that the liner forms a substantially S-shape in cross-section at the first end; further excavating the trench about an area until the beginning point is reached; overlapping the first end of the liner

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗