Patents
US 5,339,899 A#3744945 Most CitedExpiredUnited States (USPTO)Utility

Drilling fluid removal in primary well cementing

22Forward Citations (#3744945 Global)
0.7/yrCitation Velocity (#11054122 Global)
2.69Citation PageRank (#9020033 Global)
1Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

The present invention relates to methods of ensuring the maximum removal of drilling fluid from a well bore including gelled drilling fluid and filter cake deposited on the walls of the well bore prior to placing cement in the well bore between a pipe disposed therein and the walls thereof. The methods basically comprise circulating the drilling fluid through the well bore while monitoring the drilling fluid pressure, flow rate, viscosity, temperature and density. The circulating volume of drilling fluid in the well bore is then calculated and compared with the total volume available in the well bore to determine the volume of drilling fluid remaining on the walls of the well bore.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 1 · Forward citations: 22.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of determining the circulating volume of gelled drilling fluid in a well bore excluding gelled drilling fluid and filter cake deposited on the walls of the well bore comprising the steps of: (a) circulating said drilling fluid through said well bore at a selected constant volume flow rate and maintaining said flow rate for a time period whereby the well bore inlet pressure of said drilling fluid stabilizes while monitoring said well bore inlet pressure, said flow rate, the viscosity of said drilling fluid, the temperature of said drilling fluid and the density of said drilling fluid;

  2. Claim 2Depends on #1

    The method of claim 1 wherein said

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (1)

Non-Patent Literature (5)

  • "Applied Drilling Engineering", pp.144-155, by Bourgone, Jr., et al., SPE.
  • "Petroleum Engineering", Chapter 7, pp. 94-107, Carl Gatlin, Prentice-Hall Inc.
  • Applied Drilling Engineering , pp.144 155, by Bourgone, Jr., et al., SPE.
  • Perry s Chemical Engineers Handbook, Editor, Don W. Green, pp. 5 23 5 26, McGraw Hill 84.
  • Perry's Chemical Engineers' Handbook, Editor, Don W. Green, pp. 5-23-5-26, McGraw-Hill '84.