Patents
US 5,222,435 A#2358315 Most CitedExpiredUnited States (USPTO)Utility

Track renewal

29Forward Citations (#2358315 Global)
0.9/yrCitation Velocity (#8133709 Global)
6.61Citation PageRank (#2102312 Global)
11Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A track is progressively renewed in an operating direction by continuously lifting the used track rails from the used ties, replacing the old ties by new ties and laying new rails on the new ties. Before the new rails are laid, adjoining ends thereof are continuously welded together behind the location where the ties are exchanged and the welded rails are exchanged for the used rails.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 29.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of renewing a track comprised of two used rails fastened to used ties in an operating direction, which comprises the steps of (a) continuously lifting the used rails off the used ties, (b) continuously and sequentially replacing the used ties by new ties at a tie replacement track section progressing continuously in the operating direction, and (c) continuously welding adjoining ends of new rail sections together to form endless welded rails at a welding location behind the progressing tie replacement track section in the operating direction and laying the endless welded rails on

  2. Claim 2Depends on #1

    The track renewing method of claim 1, wherein the used rails are laid on the new ties at a rail replacement track section after the used ties have been replaced by the new ties, the adjoining ends of t

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗