Method and means for controlled submersion and positioning of large, heavy gravity elements on the sea bottom
Abstract
The immersion and positioning of a sink element on the sea bottom is controlled by providing a weight system suspended from the sink element. An auxiliary surface vessel has a control cable directly connecting the vessel with the weights system suspended from the sink element. The sink element is immersed with the weight system suspended therefrom and therebelow until the weight system contacts the sea bottom and the sink element reaches a preselected stabilized equilibrium elevational position above the sea bottom. Then the sink element can be laterally displaced while substantially maintaining the height of the sink element above the sea bottom by having the auxiliary surface vessel pull on the control cable connected to the weight system in a direction of movement towards the final location site. The weight system contacts the sea bottom during this movement to help control the movement of the sink element and minimize the influence of outside forces. When the sink element has substantially arrived at the final location site, the sink element is ballasted so that it will sink onto the site on the sea bottom. Buoyant floating bodies may be used for floatation and sinking of the s
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 33.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for the controled immersion and positioning of a sink element on the sea bottom, comrising the steps of: providing a sink element to be immersed and sunk to the bottom of the sea having a weight system suspended therefrom; provding an auxiliary surface vessel having a control cable directly connecting siad vessel with siad weight system suspended from siad sink elemetn; immersing siad sink element with siad weiht system suspdned therefrom until siad weight system contacts the sea bottom and siad sink element reaches a preselected stabilized equilibrium elevational postion above th
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗