Method for filling land areas with a material comprising soil and spent lime
Abstract
A composite fill material (22) comprising soil (18) and spent lime (14) and a method for filling depressed land areas (24) therewith. The method for filling land areas (24) includes generating spent lime (14) by adding lime to water (12) in order to precipitate out minerals causing water hardness. The generated spent lime (14) is mixed with soil (18) to form a composite fill material (22) which is subsequently utilized to fill depressed land areas (24) thus creating a solid soil base.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 1.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method for filling land areas including the steps of: generating a substance consisting essentially of spent lime (14) which is substantially non-reactive and will not absorb an appreciable amount of water; intermixing said substance consisting essentially of substantially non-reactive spent lime (14) with soil (18) to form a substantially non-reactive composite fill material (22); and filling a land area (24) with the composite fill material (22) to create a solid soil base.
- Claim 2Depends on #1
A method as set forth in claim 1 further characterized by selecting spent lime (14) including substantially calcium carbonate, CaCO 3 .
- Claim 3Depends on #1, #2
A method as set forth in claims 1 or 2 wherein the step of generating spent lime (14) is further characterized by adding lime to water (12) in order to precipitate out minerals causing water h
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2010124463 A1 | Method for forming a solid soil base with a material comprising soil and spent lime | — | 0 |