Method of opening cased well perforations
Abstract
The present invention provides a reliable, high efficiency perforation breakdown process. The inventive process, which utilizes a treating fluid and ball sealers, can be used in all types of wells. In the inventive breakdown process, the number of perforations existing downhole which have already been opened but have not yet been temporarily sealed is determined from observed wellhead pressures and/or wellhead pressure changes. A treating fluid flow rate is then established such that (i) the treating fluid will continue to flow through the already opened perforations which have not yet been sealed at a velocity which is at least as high as the minimum effective sealing velocity but (ii) maximum safe wellhead pressure will not be exceeded when one or more additional perforations is sealed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 4.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of opening perforations in a cased well to fluid flow, said cased well having a maximum safe wellhead pressure, using a treating fluid and perforation sealers, comprising the steps of: (a) determining the number of perforations in said cased well which have already been opened by injection of said treating fluid into said well but have not yet been sealed; and (b) establishing a treating fluid flow rate such that (i) said treating fluid flows through said already opened perforations which have not yet been sealed determined in step (a) at a velocity which is at least as high as the
- Claim 2Depends on #1
The method of claim 1 further comprising the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗