Delayed rigid foam systems and applications in particular for plugging selective treatments in the oil industry
Abstract
The invention concerns delayed gelation systems which are injected under the shape of a foam in the chosen formations. The choise of an either oil compatible, or water compatible foaming agent allows obtaining a remarkable process selectivity. Plugging; acid diversion; water control treatments are carried out.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 6.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for selectively plugging a subterranean formation comprising the steps of: (a) providing a controlled gelation or solidification system comprising an aluminum salt selected from a group consisting of aluminum chloride and aluminum hydroxychloride and a weak base selected from a group consisting of urea and hexamethylenetetramine; (b) combining the controlled gelation or solidification system with a gas and a foaming surfactant to form a foam; (c) injecting the foam into the formation to be plugged, and (d) shutting in the well for a period of time to allow solidification or gela
- Claim 2Depends on #1
The method as set forth in claim 1 wherein the step of combining comprises the step of combining a gas and a hydrophilic surfactant and wherein the step of shutti
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗