Determination of well pumping system downtime
Abstract
In a liquid well pumping system which is provided with a downtime between pumpoff cycles, the method of determining the maximum downtime includes running a plurality of tests to determine the relationship between runtime and downtime and determining when the relationship becomes non-linear for at least two consecutive tests. The downtime is selected adjacent the last linear relationship between runtime and downtime for providing a downtime which allows adequate fluid buildup in the well, but not so long a period as to loose well production.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 11.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
In a liquid well pumping system which is provided with a downtime between pumpoff cycles, the method of determining the optimum downtime comprising, providing a first downtime for a predetermined amount of time, running the pump until pumpoff occurs while measuring the runtime, continuing, for a plurality of tests, the last two steps, while increasing the downtime for each test, determining when the relationship between runtime and downtime becomes non-linear, and selecting a downtime before the non-linearly relationship.
- Claim 2Depends on #1
The method of claim 1 including, determining when the relationship between runtime and downtime becomes consecutive tests.
- Claim 3Depends on #1
The method of claim 1 wherein selecting the downtime is adjacent to the last linear relationship between runtime and downtime.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗