Patents
US 4,956,784 A#2760853 Most CitedExpiredUnited States (USPTO)Utility

Apparatus and a method for controlling the release of jobs from a pool of pending jobs into a factory

26Forward Citations (#2760853 Global)
0.7/yrCitation Velocity (#10511946 Global)
18.74Citation PageRank (#372319 Global)
0Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method is disclosed for controlling the release of jobs from a pool of pending jobs into a factory, which includes a plurality of machines processing jobs-in-progress, which comprises the following steps. First, a continuity index (CI) is calculated for one of the jobs in the job pool, which is related to the total amount of processing time required by that job, and the antipicated time to finish that job. Second, a mean continuity index (MCI) is calculated related to the CI of all of the jobs processed by the factory in a predetermined period of time. Third, a lower range (r 1 ) and an upper range (r 2 ) are calculated which are releated to the utilization factor of the machines and the fraction of jobs which are on time. Finally, a job is released from job pool into said factory if: MCI-r.sub.1 ≦CI≦MCI+r.sub.2 otherwise, the steps are repeated for the other jobs remaining in the job pool.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 0 · Forward citations: 26.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for controlling the release of jobs from a pool of pending jobs into a factory including a plurality of machines processing jobs-in-progress, said method comprising the steps of: providing a job release scheduler for controlling release of a job from the pool of pending jobs into the factory, said job release scheduler having inputs connected to the machines and other components of the factory relating to an amount of time required to process a job in the factory and an amount of time anticipated to complete the job within the factory including waiting time at the machines; calculat

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (0)

No backward patent references recorded.

Non-Patent Literature (5)

  • Bechte; Controlling Manufacturing Lead Time and Work in Progress Inventory by Means of Load Oriented Order Release; Amer. Prod. & Inv. Cntrl. Soc.; 1982 Conference Proceedings; pp. 67 72.
  • Bechte; Controlling Manufacturing Lead Time and Work in Progress Inventory by Means of Load-Oriented Order Release; Amer. Prod. & Inv. Cntrl. Soc.; 1982 Conference Proceedings; pp. 67-72.
  • Glassey et al.; Closed Loop Job Release Control for VLSI Circuit Manfacturing; IEEE Trans. on Semiconductor Manufacturing; vol. 1, No. 1; Feb. 1988; pp. 36 46.
  • Glassey et al.; Closed Loop Job Release Control for VLSI Circuit Manfacturing; IEEE Trans. on Semiconductor Manufacturing; vol. 1, No. 1; Feb. 1988; pp. 36-46.
  • Irastorza et al.; A Loading and Balancing Methodology for Job Shop Control; AIIE Trans., vol. 6, no. 4; Dec. 1974; pp. 302 307.