Patents
US 4,864,480 A#9727825 Most CitedExpiredUnited States (USPTO)Utility

Process for operating a switching controller and switching controller functioning according to this process

10Forward Citations (#9727825 Global)
0.3/yrCitation Velocity (#27241797 Global)
24.94Citation PageRank (#230917 Global)
6Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The operating process is based on the existance and cooperation of at least six functional units (64, 65, 66, 67, 68, 70), whereby the functional units (65, 66, 67) have a monitoring and control function. Functional units (64, 68, 70) together form the pause and frequency control circuit. Functional unit (65) monitors demagnetization of the transformer (2), functional unit (66) controls the time-averaged output current and functional unit (67) controls the output voltage of the switching controller. Functional unit (64) forms the voltage time-integral of the input voltage and functional unit (68) determines the target value of this voltage time-integral according to the pause duration determined. The process can be extended to monitoring the input voltage for the overshooting of a maximum value by a functional unit (71) and for under-shooting of a minimum value by a functional unit (72). A new switching phase can begin only if all functional units (65, 66, 67, 71, 72) having monitoring functions issue a release signal to an AND-gate controlling a bistable switch (70).

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 10.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A process for the operation of a free running oscillating power converter which includes a transformer (2), a primary winding (1, 61), at least one secondary winding (5) and a bi-stable switch (70), comprising the steps of: monitoring the demagnetization of the secondary winding (5) of transformer (2) and providing a first release signal if a threshold voltage falls below a threshold level; monitoring the maximum value of the time averaged secondary current of the transformer (2) and supplying a second release signal as long as the current falls below this maximum value; monitoring the out

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (2)

  • Stephens et al., "Flyback Converters for Multirail Switches," New Elec., vol. 14, No. 14, pp. 58-60, 14 Jul. 1981, (363/21).
  • Stephens et al., Flyback Converters for Multirail Switches, New Elec., vol. 14, No. 14, pp. 58 60, 14 Jul. 1981, (363/21).