Patents
US 4,850,431 A#1495139 Most CitedExpiredUnited States (USPTO)Utility

Method of forming a plurality of spaced substantially parallel fractures from a deviated well bore

38Forward Citations (#1495139 Global)
1.0/yrCitation Velocity (#6146530 Global)
19.53Citation PageRank (#347013 Global)
1Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

An improved method of forming a plurality of spaced substantially parallel fractures in a subterranean formation from a deviated well bore penetrating the formation is provided. The method comprises drilling a substantially vertical well bore into the formation and forming an initial fracture therein by applying hydraulic pressure to the formation. The in situ least principal stress direction in the formation is determined from the initial fracture and a deviated well bore is then drilled from the substantially vertical well bore into the formation at an angle and in a direction substantially parallel to the in situ least principal stress direction in the formation. Casing is placed in the deviated well bore, and a plurality of spaced fracture initiation points are created therein by forming a set of perforations of predetermined number and size through the casing and into the formation at the location of each of the fracture initiation points. Hydraulic pressure is applied under predetermined conditions to the sets of perforations at the fracture initiation points simultaneously to thereby extend a plurality of spaced substantially parallel fractures in the formation from the devi

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 1 · Forward citations: 38.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of forming a plurality of spaced substantially parallel fractures in a subterranean formation from a deviated well bore penetrating the formation comprising the steps of: (a) drilling a substantially vertical well bore into said formation; (b) forming a fracture in said formation by applying hydraulic pressure to said formation by way of said well bore; (c) determining the in situ least principal stress direction in said formation from the fracture formed in step (b); (d) drilling a deviated well bore from said substantially vertical well bore into said formation at an angle and

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (1)