Large scale concrete conveyance techniques
Abstract
The disclosure describes a method and apparatus for continuous mixing, transporting and placing of large quantities of concrete in which aggregate transported on a belt conveyor is mixed with metered quantities of cement and water adjacent a place of pouring. Alternatively, mixed concrete is transported to a place of pouring protected from the elements on a belt conveyor covered by a tunnel that confines cooled air.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 23.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An apparatus for continuously mixing, transporting and placing large quantities of concrete in building a dam located against a lake and remote from a stockpile of sand and several sizes of aggregate comprising (a) a master belt conveyor running from said remote point to the dam site, (b) means for placing metered quantities of sand and several sizes of aggregate from said stockpile on said master belt conveyor, (c) a mobile rotary tube mixer disposed on said dam, said tube mixer having an inlet and outlet at opposite ends thereof, (d) a tripper belt conveyor between said master belt con
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 23 total)
References Cited — Backward Prior Art (27)
Non-Patent Literature (5)
- Title: "Construction Ingenuity Displayed at Diablo Dam", Publication: Engineering News-Record; date: Aug. 29, 1929, pp. 320-324.
- Title: Construction Ingenuity Displayed at Diablo Dam , Publication: Engineering News Record; date: Aug. 29, 1929, pp. 320 324.
- Title: Grouted Gravel Fill and Precast Slobs Provide New Face for Barter Dam; Author: Davis et al.; Date: 2 1948, pp. 26 31; Publication: Civil Engineering.
- Title: Grouted Gravel Fill and Precast Slobs Provide New Face for Barter Dam; Author: Davis et al.; Date: 2-1948, pp. 26-31; Publication: Civil Engineering.
- Title: Million Yards of Concrete Placed at Record Rate; Pub. Engineering News Record; date: 12/21/33; pp. 743 750.