Molding for the retention of a tie in the concreting of a precast concrete part
Abstract
A molding for the retention of a tie during the concerning of a precast concrete part is provided. In the removal of the molding from the recess of the precast concrete part, the molding is drawn off from the tie, so that the tie head projects into a recess in the precast concrete part. So that it can be pulled out of the precast concrete part easily, the molding has at least one lifting-out part which is preferably in the form of a rope loop and which, on the lifting-out side facing away from the precast concrete part, can be bent into the plane of the lifting-out side or raised outward in order to pull out the molding.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 67.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An apparatus for positioning a tie having an orifice within a precast concrete part while the precast concrete part is being formed, comprising: a molding removeably securable to the tie, the molding comprising: a top surface adapted to face outward from the precast concrete part when the tie is positioned within the precast concrete part; a slot for receiving the tie, the slot having a bottom lying along an axis; lug means insertable into the orifice of the tie when the tie is inserted into the slot, the lug means being moveable out of engagement with the tie upon outward flexing of the m
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗