Method of automatically determining drilling fluid lag time while drilling a well
Abstract
A continuously adjusted calculated annulus drilling fluid lag time while drilling oil and gas wells and analyzing the drilling mud at the well surface for formation gas, fluids and rock in order to accurately index the release of the formation gas, fluids and rock released by the drill bit with the depth at which they were released. The method obtains such analyses by using a computer and pumping pressure to accurately track the drilling mud time lag and automatically adjusts for variations in the annulus flow rate to correlate the recorded data with its originating depth.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 17 · Forward citations: 25.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
The method of automatically determining the lag time for drilling fluid to move through a well annulus while drilling a well in which drilling fluid is pumped down a drill pipe, out of a drill bit and up the annulus comprising, measuring the lag time, by inserting a marker in the drill pipe, and deriving a relationship between measured pump strokes, pump pressure and fluid velocity in the annulus, determining a relationship between pump pressure and lag time over a range of pump pressures, thereafter continuously measuring pump pressure while drilling and calculating lag time from the rela
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗