Method of forming cast-in-place concrete pile
Abstract
There is disclosed a method of forming a cast-in-place concrete pile. A demolition-facilitating substance is mounted in an open top confined space above a predetermined level. The demolition-facilitating substance is expansible upon lapse of a predetermined period of time. Concrete is poured into the confined space to cover the demolition-facilitating substance to cast a concrete pile, so that the demolition-facilitating substance is expanded to produce cracks in the concrete pile above the predetermined level.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 34.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of forming a cast-in-place concrete pile which comprises the steps of: (a) mounting a plurality of tubes filled with a demolition-facilitating substance in an open top confined space above a predetermined level, said demolition-facilitating substance being in the form of a slurry; and (b) subsequently pouring concrete into said confined space to cover said tubes to cast a concrete pile, so that said demolition-facilitating substance being adjusted in such a manner that said demolition-facilitating substance is caused to expand to rupture said tubes to produce cracks in the concrete
- Claim 2Depends on #1
A method according to claim 1, in which before the step of mounting said demolition-facilitating substance, a reinforcement of a latticework is p
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗