Process of testing blow-out preventer without pulling the wear bushing
Abstract
To avoid the excessive cost and time required to pull the wear bushing from a sub-sea well head in deep water to enable frequent periodic testing of the blow-out preventer, a casing integrity test tool is assembled to a wear bushing running and retrieving tool and this assembly is run into the well until it lands on a seating surface of the wear bushing. A dart for delivering tool energizing pressurized fluid is dropped through the drill pipe and pressurized to a pressure above the pressure being employed to test the blow-out preventer. While maintaining pressure on the drill pipe and dart, the blow-out preventer is tested except for the blind rams. After completion of the testing, pressure is relieved on the drill pipe, the dart is retrieved, and dry string retrieval of the test tool assembly is then carried out.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 19.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A process of testing a blow-out preventer and simultaneously testing well casing below the wear bushing for wear without pulling the wear bushing, comprising running a test tool assembly having spaced elastic ring seals and metal seal containment rings into a well and landing the assembly on a support surface of the wear bushing with the test tool extending into the bore of the well casing immediately below the wear bushing, dropping a fluid delivery dart through drill pipe into the test tool assembly until the dart is seated on an internal support surface of the test tool, pressurizing the dr
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗